Ardanuy
The company was founded in December 1992. Over the course of these 18 years it has carried out more than 800 projects in Spain and all over the world with a sales volume in 2009 of 9.2m euros, 45% of that figure from international contracts.

It has been involved in all the major high speed railway projects in Spain and in various road and motorway projects.

5% of profits are reinvested into Research and Development and the development of specific software such as RailPower, RailTraffic, AutoElec, SIG, analysis RAM, etc.

With interest in obtaining more international experience, the company created branches in Lithuania (2003), Poland (2006), India (2007), Argelia (2010), Colombia (2010) and USA (2010).

Currently the company is made up of more than 100 people amongst whom 80% are engineers of a high level.






                  Click the icon to see the image in full screen
Design of 25kv overhead equipment system for elevated lines and power supply & scada for both underground and elevated lines including checking of design of receiving Substations and design validation of Delhi MRTS phase –III Project.
News

23-05-2013

 

20-12-2012
Informacija apie parengtą „Rail Baltica“ geležinkelio ruožo Rokai – Palemonas – Kaunas rekonstrukcijos poveikio aplinkai vertinimo (PAV) programą

 

01-12-2012
Supervision of the design, construction and commissioning of three lines of the La Paz - El Alto cable car system. The contract, with a value of 5 million USD and timeframe of 19 months has been awarded by the Bolivian Ministry of Transport to Ardanuy ingeniería S.A. in consortium with the companies Cal & Mayor (Mexico) and Cryotec (Bolivia)

 

Corporate Brochure