Home » News

News

 
INFORMATION REGARDING ROKAI - PALEMONAS-KAUNAS RECONSTRUCTION Informacija apie parengtą „Rail Baltica“ geležinkelio ruožo Rokai – Palemonas – Kaunas rekonstrukcijos poveikio aplinkai vertinimo (PAV) programą
 
THREE LINES OF THE LA PAZ - EL ALTO CABLE CAR SYSTEM Supervision of the design, construction and commissioning of three lines of the La Paz - El Alto cable car system. The contract, with a value of 5 million USD and timeframe of 19 months has been awarded by the Bolivian Ministry of Transport to Ardanuy ingeniería S.A. in consortium with the companies Cal & Mayor (Mexico) and Cryotec (Bolivia)
 
AUDIT FOR THE ATLANTIC RAIL NETWORK, COLOMBIA Ardanuy, in consortium with Cal & Mayor (Mexico) and TNM (Israel), has been awarded this contract by the National Infrastructure Agency, with a value of approximately €3.5M over a timeframe of 37 months
 
CONTRACT WITH NEW DELHI METRO AWARDED The contract, awarded in consortium with Indian Engineering firm BARSYL for the amount of 542,000 euros
 
ARDANUY PROTECTS THE FUTURE OF THE MEDELLÍN CENTRAL CONTROL CENTRE The Medellín Metro (“Metro de Medellín”) has entrusted Ardanuy, in a joint venture with AIM Engineers, to draft the Remodelling and Adaptation project for the Company´s Central Control Centre building.
 
EARTHWORKS IN THE VERA – LOS GALLARDOS SECTION 80% of the work to be done on the inverted arch of the future artificial tunnel has been completed and progress continues to be made in the construction of the overpasses and drainage system throughout the Vera-Los Gallardos section of the Spanish high speed (AVE) Almería-Region of Murcia line in the Mediterranean Corridor.
 
INDEPENDENT SAFETY ASSESSMENT OF THE LD-1X0-P FAMILY OF LED LAMPS In the railway safety field, Ardanuy Ingeniería offers both support services for the preparation of Safety Cases for generic products and applications and Independent Safety Assessments of the same.
 
 
-------------
-------------
-------------
-------------
-------------
-------------
-------------